Monday, December 22, 2008

Drywall

12/22/08 -- The drywall is now up in the house and painting has begun on the walls. Below are some pictures of the drywall process.

Figure 1. First floor bathroom.

For the bathtub and shower surrounds, CHDC used Georgia-Pacific DenoArmor Plus High-Performance Interior Panel; a paperless drywall that has fiberglass mats on the front and the back and which is highly mold-resistant. Paperless drywall is required by LEED for Homes in order to reduce the risk of mold and mildew inn moisture-rich environments such as bathrooms.



Figure 2. Second floor bathroom.


3. Kitchen, looking north.


4. Stairway, looking down towards first floor.


5. Master bedroom on second floor, looking north.

0 comments: