11/25/08 -- Finishing touches are being put on the outside of the house, while on the inside the insulation is being installed.


Front facade: finished roof, siding, windows, decking and stonework.

Detail of the stonework (limestone).

The rain garden planter next to the deck.


Inside the rain garden planter --
this will eventually be filled with soil and plants to help divert rainwater from the roof.



Looking up through the open dormer above the deck.


The concrete pavers for the front and back walkways.
These will be set in place once the landscaping is ready to be put in.



Looking up at the second floor.

The tree in back was marked off to protect the root system during construction.


The garage pad in the back, off of the alleyway.



Insulation in the conditioned space of the upper floor.


Insulation on the stairwell wall, leading to the second floor.



Insulated water pipes, helps maintain water temperature and efficiency throughout house.